亚洲AV无码兔费综合,精品国产一区二区自拍,亚洲美综合乱码精品成,日本国产精品高清在线,久久久噜噜噜久久免费,久久婷婷五月综合色国产免费观看,免费无码又爽又刺激网站,国产黄色大片一区精品,自拍视频在线观看后入,亚洲色欲色欲WWW在线丝

<fieldset id="e6y02"><menu id="e6y02"></menu></fieldset>
  • <del id="e6y02"><dfn id="e6y02"></dfn></del>
      • <fieldset id="e6y02"><menu id="e6y02"></menu></fieldset>
      • <del id="e6y02"></del>
        <strike id="e6y02"></strike>
      • 中文

        News - Company News

        Your Current Location:Home - News - Company News

        News - Company News

        Here are the enterprise dynamics and industry information you care about

        [Air conditioner for loader] Method of installing air conditioner for loader

        Release Time:2020-04-21 10:05:19      Clicks:329

        Summer is coming soon. I think all friends will make heatstroke prevention measures. Today, Peng Tai Xiaobian will introduce the basic knowledge and installation methods of loader air conditioner.

        1、 Composition of air conditioning system of loader

        Air conditioning systems used on small forklift trucks all use a method called volatilization reduction refrigeration unit. This kind of system software consists of refrigeration compressor, condenser, liquid storage drying bottle, air conditioning expansion valve and air conditioning evaporator. Such components are connected with each other according to aluminum alloy tubes or rubber hoses, and the refrigerant is placed in the sealed pipeline system software (refrigeration cycle).

        2、 Principle of air conditioning refrigeration cycle

        The compressor is driven by the diesel engine. The high-temperature and high-pressure refrigerant steam discharged from the refrigeration compressor enters the condenser according to the high-pressure rubber tube. Because the temperature of the high-pressure refrigerant steam is higher than that of the gas outside the window, the cooling fan is used to make the heat of the refrigerant steam in the condenser be carried away by the gas outside the window, so that the high-pressure refrigerant steam can be cooled into a high-pressure liquid with a higher temperature, Inject the drying bottle according to the high-pressure rubber tube, and pass through the air conditioner expansion valve after drying and filtering.

        With the throttle valve function of the air conditioning expansion valve, the refrigerant becomes an ultra-low temperature, bottom pressure liquid and enters the air conditioning evaporator. It is vaporized under uniform conditions and digested and absorbed the heat of the gas outside the tube of the air conditioning evaporator, so that the temperature of the circulating gas in the trunk and car passing through the air conditioning evaporator is reduced and turned into an air conditioner. The refrigerant is sent into the trunk according to the blower motor to reduce the gas temperature in the car. The vaporized refrigerant vapor is sucked in by the refrigeration compressor to shrink, and then becomes the refrigerant vapor with high temperature and pressure. It is pressed into the condenser according to the high-pressure rubber tube, completing a refrigeration cycle of the air conditioning system.

        3、 Operation Manual of Control Panel

        The control panel on the housing is shown in the figure below. The functions of these power switches and display lights are:

        1. Refrigeration power switch: used to operate the compressor.

        2. Power switch of exhaust air volume; It is used to control the speed ratio of the volatile centrifugal fan, so as to select a suitable exhaust air volume.

        3. Display light: bright red light indicates that the blower motor is running and the system software is in working attitude; The emerald green light indicates that the refrigeration compressor starts the refrigeration unit in a working attitude.

        Adjust the view angle of the air outlet to change the view angle and direction of the wind blowing; Adjust the power switch of exhaust air volume to obtain high, medium and low exhaust air volume.

        4、 Installation method of key components of loader air conditioner

        The installation of key components is a particularly important stage in the adjustment of the air conditioning system. The quality of the key components of the air conditioning system depends on the cooperation between the dealer and the automobile manufacturer. The key components of the air conditioning system from the dealer to the automobile manufacturer are only processed as semi-finished products. They must be connected according to the automobile manufacturer's system to produce a complete picture. Therefore, the installation quality of air conditioners in the assembly line of automobile manufacturers will immediately endanger the quality of the air conditioning system.

        Unscrew the anti fouling cap when connecting the pipe heads of the refrigeration compressor. It is unnecessary to place the pipe heads below the level to prevent the exposure of lubricating grease. When connecting the drive belt with the driving wheel, check the tension parallelism of the drive belt. The allowable deviation is 0~1mm. The tension of the transmission belt shall be checked in the following way: use the middle thumb to apply force to the point diastolic pressure of the transmission belt in the middle of the two wheels, and the elastic pressure range is 4~7mm.

        During the whole process of transporting the condenser, handle it with care. It is not necessary to knock the rectangular square tubes of the liquid header to prevent refrigerant leakage. During installation, pay attention to the fact that the big pipe head is upward and the small pipe head is downward. When the pipe head is connected, unscrew the antifouling cap. When the pipe head is clamped, use two wrenches to clamp it vigorously in the opposite direction. Since the condenser is an aluminum profile, pay attention to the extent of use to prevent it from being locked. The route layout shall avoid high temperature area and obtuse angle area to avoid burns or damage.

        The cap and pipe joint of the dry liquid storage bottle shall be opened after the preparation is completed to prevent the absorption of water in the air. There is a laminated glass liquid sight glass on the top of the liquid drying bottle. Be careful not to knock it to prevent refrigerant leakage. Attention shall be paid to the connection of the pipe head. The direction of the arrow symbol marked with "←" on the end of the liquid storage drying bottle shall be connected with the evaporator of the air conditioner in a relative way, and it shall not be inserted incorrectly.

        During the whole transportation process of the air conditioner evaporator, handle it with care, and do not damage the pipeline to prevent refrigerant leakage. When the pipe head is connected, unscrew the anti fouling cap. When the pipe head is clamped, use two wrenches to firmly clamp it in the opposite direction. Do not loosen it to the air conditioning expansion valve.

        Previous:The refrigeration process of tractor air conditioning in agricultural machinery
        Next:Composition of air conditioner

        Back to list

        News you are interested in
        亚洲综合伦理一区三区| 亚洲精品国产亚洲精品| 东京热久久综合久久88| 亚洲av成人专区精品| 欧美在线人视频在线观看| 国产在线精品综合色区| 制服 丝袜 亚洲 中文 综合| 一级毛片在线播放免费观看| 2021国产精品视频网站| 九九热视频精品在线| 国产精品剧情一区二区| 国产成人剧情av在线| 国产女主播白浆在线看| 午夜男女爽爽影院免费视频下载| 国产精品自在拍首页视频8| av天堂资源在线免费| 白丝一区二区三区四区| 99热最新在线| 国产欧美精品午夜在线播放| 成人免费A级毛片无码片2022| 国产成人综合网在线观看| 国产亚洲精品自拍视频| 国产又爽又黄无码无遮挡在线观看| 中国国语毛片免费观看视频| 日韩一区二区三区中文| 日韩V欧美V中文在线| 国产亚洲成AⅤ人片在线观看| 欧美色99| 国产最爽的乱婬视频国语对白| 国产性生大片免费观看性欧美| 在线国产一区二区视频| 一本一本大道香蕉久在线播放| 在线播放av免费观看| 日韩久久无码免费毛片软件| 青青草a国产免费观看| 亚洲中文字幕无码AV在线| 中文字幕日韩人妻一区| 国产成人午夜精品久久| 国产SUV精品一区二区| 青青国产成人免费精品视频| 最近中文字幕国产精选|